Cambria Refit 2014/15
Treated sheer plate
Photo By: A. Barkham
Giving life back to old planks
Photo By: A. Barkham
Sheer plank reinstating (First laminate encasing bulwark dumps)
Photo By: A. Barkham
Rudder removal.
Photo By: N. Hambly
Removing glass.
Photo By: A. Barkham
Original Horn Timber
Photo By: A. Barkham
Stainless fastenings
Photo By: A. Barkham
Old doubler plate by way of mast circa 1972
Photo By: A. Barkham
Doubler plate removed
Photo By: A. Barkham
Sheer plate repairs; new stem keel plate
Photo By: A. Barkham
Sheer planks refastened, hanging repaired (edged) planks
Photo By: A. Barkham
New steelwork
Photo By: A. Barkham